cn.png中文版|en.pngENGLISH|ey.pngрусский

Geocell production line
message
Detailed introduction

Geocell production line


The construction party's rule for civil cells is to first pull apart the stacked cells and pave them with some fibrous materials according to the environment of the foundation. Then, it is fastened with nails, probably connected to the stretcher frame, and then it is supplemented with a loader until it is filled and exceeds the top of the cell, and then it is vibrated and rolled to complete the lower layer. At this time, the cell system can carry various construction equipment, so it can be directly constructed on it, and the surface course can be completed by the general method.


The introduction of geogrid production line equipment said that because the civil lattice has a series of advantages, such as very good mechanical properties, convenient construction, and high cost, it has lost more and more widespread application. The use of civil cells is mainly reflected in the treatment of stable railway subgrade and highway soft foundation, the prevention of bearing gravity, the retaining wall, the treatment of river channels, the supporting structure of pipelines and sewers, and can also be used as a mixed retaining wall to prevent landslides and their bearing gravity, as well as the treatment of Gobi, beaches, riverbed and river banks.


Previous:Drainage net production line
Next:Biaxialgeogridproductionline...

分享到